South Dakota

Specific Requirements

Additional federal label restrictions for South Dakota:

  • Cutoff date: DO NOT apply after June 20.
  • All applicable labeling (container, South Dakota-specific, and collateral labels) must be in the possession of the user at the time of the pesticide application. Read the label affixed to the container before applying.

      RECORD KEEPING

      • The certified applicator must keep required documentation for a period of 3 years; records must be generated on the day of application
      • All other record keeping requirements on the label must be followed